Steel Warehouses

Companies turn to steel warehouses because they deliver massive clear‑span interiors, ultra‑fast erection and low lifetime costs. Factory‑cut frames bolt together in weeks, creating column‑free space that streamlines dock‑to‑rack flow and adapts easily to cranes, high‑bay racking or automation. Energy‑saving roof coatings, insulated panels and steel’s innate fire‑ and pest‑resistance keep operating, insurance and maintenance costs down, while the structure’s modular design future‑proofs the investment. Simply put, no other building system matches a steel warehouse for speed, strength, and long‑term value.

Why Choose Steel Warehouses?
What to Expect?
Standard Features
Usage
Resources
Icon

Clear Span Construction

Our warehouses feature a pre‐engineered design that eliminates interior columns. This clear span configuration delivers expansive, uninterrupted space—ideal for storage logistics and forklift operations. With layouts that can reach up to 350' wide and 100' high, your facility maximizes every square foot.
Icon

Did You Know?

The modular design of metal warehouses means every component—from beams to panels—is engineered for long spans.

This adaptability provides the flexibility needed for varied storage setups and efficient workflow design.
Icon

Customizable & Expandable

Every business is unique. Our metal warehouses are fully customizable with bespoke floor plans, varied clearance heights, and flexible layouts—designed to fit your current operations and accommodate future growth seamlessly.
Icon

Did You Know?

The modular nature of PEMB construction enables steel warehouses to expand in phases. As your needs evolve, additional bays or sections can be integrated without disrupting your ongoing operations.
Icon

Inexpensive Yet Sturdy

Constructed from recycled steel, our red-iron warehouses deliver exceptional durability without breaking the bank. The low material waste and efficient prefabrication process make PEMB construction highly cost-effective while maintaining superior strength.
Icon

Did You Know?

PEMB warehouses offer significant savings over time due to reduced maintenance needs and fewer repairs. Their robust construction ensures the building withstands heavy loads and challenging climates, protecting your investment.
Icon

Quick & Easy Erection

Pre-engineered components allow our red-iron warehouses to be assembled up to 30–50% faster than traditional construction. With materials delivered pre-cut and ready to install, project downtime and labor costs are significantly reduced.
Icon

How Fast?

Steel warehouses can be operational in weeks rather than months. This accelerated timeline means faster move-ins and an earlier start toward generating revenue.
Icon

Low Maintenance & Insurance Savings

Our warehouses are built with non-combustible, durable materials that require minimal upkeep. Their resistance to pests, fire, and extreme weather translates to lower long-term operating costs.
Icon

Did You Know?

Insurance premiums for metal warehouses are often up to 30% lower compared to traditional wood-framed structures, thanks to their enhanced safety features and reduced risk of damage.
Icon

Attractive & Long Lasting

Modern PEMB warehouses boast a sleek, contemporary design that can be finished in a variety of colors and facades. They not only meet operational needs but also present a professional, attractive appearance in any industrial park.
Icon

Built for the Long Haul

Steel warehouses are engineered for longevity with high-quality PBR panels that offer non-fade, long-lasting finishes—often backed by warranties of over 20 years. This ensures a reliable, stylish structure for decades of use.
01 Discovery & Quote (Week 1)

Begin with an initial project consultation to identify key needs and set clear goals. Our team will develop conceptual designs, prepare preliminary sketches, and provide you with a detailed quote so you know what to expect right from the start.

02 Design Sign-Off (Week 2)

After reviewing the initial designs, you’ll approve the final layout and contract. We’ll then coordinate the fabrication timeline and provide an estimated materials delivery date, ensuring everyone is aligned before proceeding to the next stage.

03 Engineering & Detailing (Weeks 3–5, 3–8, or 3–12)

Our engineers produce stamped permit drawings based on your project’s complexity:

  • Small Projects (Weeks 3–5): Approximately 2–3 weeks for stamped drawings.
  • Medium Projects (Weeks 3–8): Expect 4–6 weeks for simple self-storage buildings.
  • Large/Complex Projects (Weeks 3–12): More intricate designs (crane loads, mezzanines, complex rooflines, climate-controlled units) may take 8–10 weeks.
04 Initial Project Requirements & Site Preparation (Typically 4–8 Weeks)

With approved drawings in hand, your contractor handles permits, sitework, and foundation preparation. This pre-construction phase—securing necessary permits, performing site grading, and forming/pouring the foundation—usually spans 4–8 weeks, setting the stage for a smooth installation.

05 Delivery Preparation

We finalize production schedules and prepare your materials for shipment. Throughout this phase, we maintain open communication, ensuring that you, your contractor, and our team are coordinated for an efficient delivery and installation process.

06 Final Project Installation (Typically 1–3 Months)

Once materials are delivered, your contractor begins the metal building system (MBS) installation. Depending on complexity and site conditions, this can take 1–3 months, during which we remain focused on providing a quality, durable structure that meets your expectations.

07 Walkthrough & Completion

After installation, you’ll join your installer in a thorough walkthrough to ensure everything meets your specifications. Your satisfaction is our priority, and we’ll continue to offer support should you need any future assistance or modifications.

Stamped Building and Foundation Plans 
100% Steel, Primary & Secondary Framing
Roof & Wall Sheeting
Complete Trim & Closure
Fasteners
Delivery to Site
Erector’s network nationwide 
Construction available in GA/TN

Nibco-Plant-Expansion-Warehouse

How Businesses Are Putting Steel Warehouses to Work Right Now

1  |  Industrial & 3PL expansion
North‑American warehousing topped ≈ $335 billion in revenue last year and is still projected to grow 7 % annually through 2030. Third‑party logistics (3PL) firms and advanced manufacturers choose clear‑span steel warehouses for fast erection, high‑bay racking, crane rails and unobstructed forklift aisles that shave hours off every shift.

2  |  E‑commerce & omni‑channel fulfillment
Online sellers live and die by speed‑to‑market. A pre‑engineered warehouse ships as a precision‑cut kit, so the shell goes up in weeks—not months—keeping inventory moving. Built‑in dock‑lines, 32‑ to 40‑ft clear heights, and optional insulated metal panels (IMPs) create an energy‑efficient, future‑proof hub for next‑day delivery.

3  |  Small‑ and mid‑size producers
Metal shops, modular‑home plants and food processors like the way prefab warehouses scale: start with a 60 × 120 ft shop today; bolt on 20‑ft bays tomorrow without shutting down. Standard 26‑ga PBR walls shrug off oils, steam and fertilizer dust, while galvanized secondary framing adds extra corrosion defense.

4  |  Cold‑chain & specialty storage
Steel frames handle the heavy point‑loads of multi‑tier freezer racking and automated pallet shuttles. Because the structure sits outside the insulated envelope, thermal bridging is minimized—ideal for pharmaceuticals, produce or any tight‑temperature spec. Need rooftop solar? The frame is already engineered for the load.

5  |  Investor‑owned “spec” space
Market analysts peg the U.S. prefab‑building segment at $43 billion in 2025, rising to $57 billion by 2030. Developers meet that demand with 32‑ to 36‑ft‑clear steel warehouses on 60 × 60 ft column grids—easy to up‑fit with mezzanines, conveyors or mini‑load AS/RS pods when a 3PL or e‑tailer signs the lease.

Please Check Back Soon

The SCB Difference

For over 24 years, SteelCo Buildings has delivered top-quality pre-engineered metal building (PEMB) materials and self-storage solutions. From prefab kits to custom designs, we provide 100% American-manufactured, sustainable materials backed by stamped foundation plans and expert guidance on permits and zoning. With decades of experience and a 92% satisfaction rate, SteelCo combines superior quality with unmatched customer support to ensure every project’s success.

24+ Years Expertise

Designing and Building Prefabricated Metal Buildings

Full Service

Installation & Coordination can be provided across most of the USA.

92% Satisfaction Rate

4.6 stars on Google Reviews and BBB accredited business.

Stamped Foundation Plans

These can be provided upon request.

90-100% Recyclable

Recyclability rate for the primary materials used in PEMB buildings.

100% American Manufactured

We only work with American suppliers for materials.

"I looked along and hard for a steel building supplier...I gave Brad and Ben a call, they took care of everything including all the changes and extras for my building! Great experience from start to finish! I'll be a repeat customer!"

Joey Ayash

steel building testimonial image

"SteelCo helped us build our dream barndominium. We explained what we wanted for our building and they exceeded our expectations! We had excellent help in planning as well as some great suggestions by the SteelCo team. All SteelCo team members we spoke with were extremely professional and responsive, which made the whole process smooth sailing."

Mickey Thomas Motorsports

steel building testimonial image

"...Everyone is quick to getting you a quote but not everyone treats you with the respect and professionalism that SteelCo has done. I chose SteelCo because it didn't feel like a "sales guy" calling me and making me rush into something...I made what felt like a thousand changes to my building...but they never sounded upset or made me feel like I was wasting their time..."

Travis Marshall

steel building testimonial image

What our clients have to say

See why 92% of our customers rate us highly on Google Reviews.
Hear directly from clients who trust SteelCo Buildings for quality, reliability, and exceptional service.

  • Stephen Brewer

    "Great experience working with Clint at SteelCo. He quickly got me a very good price, compared to other quotes we had. He helped me edit the design based on what i wanted. During construction, we couldn't find some bolts and he had them shipped to us quickly. Very easy to work with."

  • Frank Moore

    "SteelCo has been awesome in all aspects of our project. From design, purchase and delivery these guys know what they are doing and do it professionally. I strongly recommend SteelCo for your next steel building project."

Industry Stats

Our growth measured in units, SF, and states served

3000 +

Years In Business

3000 +

Units Sold

50

States Sold In

1000000 +

Avg Annual SQFT

Frequently Asked Questions

Get answers to common questions about our self-storage building kits, customization options, and services.

01

What are the most commonly ordered sizes for steel warehouses?

Steel warehouses typically range in size from 6,000 square feet to over 100,000 square feet. However, we can customize your building to meet your specific storage, manufacturing, or distribution needs.

02

Can I build my warehouse in phases?

Yes, building your warehouse in phases is entirely possible and often a smart approach for businesses anticipating growth. By understanding your long-term vision upfront, we can help you plan and blueprint for future expansions, ensuring your building’s design can accommodate additional space or features when needed. This phased approach provides flexibility while optimizing costs and timelines.

03

Why choose a steel warehouse over tilt-wall construction?

While tilt-wall buildings offer a longer lifespan of up to 100 years, steel warehouses are more cost-effective with a typical lifespan of 50 years. They are faster to construct, easier to expand, and provide a quicker return on investment. With efficient prefabrication, modular design, and lower upfront costs, steel buildings offer flexibility for phased growth and modifications—making them ideal for businesses anticipating future expansion.

04

What are typical project timelines for steel warehouse buildings?

Timelines vary by size and complexity, but most small warehouses (around 6,000–10,000 SF) can be completed in a few weeks after delivery. Medium projects (around 20,000–50,000 SF) typically take 2–3 months, while large-scale facilities (over 50,000 SF) may require 3–6 months or more depending on permitting, site prep, and interior build-out. Our team can provide a more specific estimate based on your project scope. Please see our General FAQs page for more info on typical project timelines.

Have A Project In Mind?

Connect with our team to explore built-to-fit construction solutions.

Ft.
Ft.
Ft.
Please enter 0 if you are unsure. Do NOT include units.

Our Service Areas

Explore our reach—serving clients nationwide with expertise across all three divisions

Where We Ship

Building Materials Nationwide

Where We Erect

Southeast USA

Construction Services

GA, SC and TN